What is #HIP | What to expect during Home Improvement Programme | Best Tips for HDB HIP Singapore

Home Depot
Thank you for watching!

‼️Disclaimer: ⚠️
✖This video is not sponsored.
✔My opinions and reviews here are strictly my and my family’s own

🎶All copyright goes to the owner of the music played in the background; no infringement is intended.

♡Subscribe to us #jesgbc ⬇️⬇️♡
https://www.youtube.com/c/jesgbc

Sharing this video based on our very own experience. You can find out more from the link below ⤵️⬇️

https://www.hdb.gov.sg/residential/living-in-an-hdb-flat/sers-and-upgrading-programmes/upgrading-programmes/types/home-improvement-programme-hip

What to expect for the 10 Days of activity?

Day 1:

– Lay protection on the floor and provide vertical wall plastic protection before the hacking work starts
– Dismantling of existing bathroom/toilet accessories and wiring
– Hacking of existing wall and floor tiles in bathroom/toilet and removal of paint
– Installation of portable toilet at the end of the day

Day 2:
– Repairing of spalling concrete (if any)
– Replacement of the floor trap and basin piping at bathroom/toilet
– Level peg for toilet/bathroom wall
– Rewiring for non-compliance water heater (if any)

Day 3:
– Skimming to common/master bedroom toilet ceiling
– Chamfering to side wall and pipe followed by 300mm upturn with waterproofing screed
– Dismantling and replacement of aluminium louvre vent at bathroom/toilet (am)
– Application of a layer of non-shrink grout in bathroom/toilet floors (pm)
– Repairing of spalling concrete (if any)

Day 4:
– Application of waterproofing membrane (2 coats) to bathroom/toilet floors
– Application of a layer of non-shrink grout in bathroom/toilet floors (pm)

Day 5:
– Conduct 1st water test to bathroom/toilet (4 hours)
– Screeding to bathroom/toilet floors
– Replacement of refuse chute hopper (if any)

Day 6:
– Plastering work to toilet/bathroom wall
– Painting to toilet ceiling

Day 7:
– Wall tiling work to common toilet and master bedroom toilet walls

Day 8:
– Floor tiling work to common toilet and master bedroom toilet walls
– Measurement of bi-fold aluminium door
– Replacement of main entrance gate and handling over of keys to resident upon completion (if any)

Day 9:
– Installation of pedestal pan, sanitary pipes, wash basin, grab bar and toilet door
– Installation of EASE grab bar and ramps inside unit (if any)
– Replacement of main entrance door, painting of existing main door frame and handling over of keys to resident upon completion (if any)
– Reinstatement of existing fixtures to bathroom/toilet and painting to bathroom/toilet ceiling pipes
– Defects rectification works (if any)
– Removal of portable toilet
– Painting work to toilet ceiling and pipe

Day 10:
– Conduct 2nd water test to bathroom/toilet (4 hours)
– Application of EASE slip-resistant treatment (if any)
– Touch up painting
– Cleaning and housekeeping
– Handover to resident

Products You May Like

Articles You May Like

Studio Sconce Makeover — From Black To White With Gold Leaf Accents
This Is The Point Where I Second Guess My Decisions
xTool S1 Laser: Setup and First Project
Minor Studio Cabinet Changes With Big Potential Impact (Tell Me Your Thoughts On These Changes)
5 Ways to Do Sublimation with No Printer!

Leave a Reply

Your email address will not be published. Required fields are marked *